EMBARGO: Only to be published or disseminated at 12:00 hour, Tuesday, 8 November 2022

QUARTERLY CONSTRUCTION STATISTICS, THIRD QUARTER 2022

 

HIGHLIGHTS

The value of work done in construction sector surged 23.2 per cent in the third quarter of 2022, amounted to RM30.5 billion

 

The value of construction work done in the third quarter 2022 surged 23.2 per cent (Q2 2022: 6.1%) as compared to the same quarter of 2021, amounting to RM30.5 billion (Q2 2022: RM29.9 billion). The expansion was driven by Non-residential buildings (37.7%), Special trades activities (32.2%), Residential buildings (17.8%) and Civil engineering (14.6%) subsectors.

In the third quarter of 2022, the Civil engineering remained as the main contributor to the value of construction work done with a share of 37.9 per cent, followed by Non-residential buildings (30.4%), Residential buildings (22.3%) and Special trades activities (9.4%).

The value of work done owned by private sector stood at RM18.0 billion, soared 31.8 per cent (Q2 2022: 14.8%) which contributed a share of 59.0 per cent. Meanwhile, the value of work done owned by public sector increased 12.6 per cent (Q2 2022: -4.0%).

Selangor recorded the highest value of construction work done at RM6.9 billion, followed by Wilayah Persekutuan (RM5.3 billion) and Sarawak (RM3.6 billion) which collectively contributed 51.9 per cent or RM15.8 billion.

The construction work done for the sum of three quarters of 2022 registered a value of RM89.9 billion, posted an increase of 6.6 per cent as compared to the same period of 2021 (3Qs 2021: -2.1%).

The full publication of the Quarterly Construction Statistics, Third Quarter 2022 can be downloaded through eStatistik portal.

 

Released by:

DEPARTMENT OF STATISTICS MALAYSIA
8 NOVEMBER 2022


Contact person:
Baharudin Mohamad
Public Relation Officer
Strategic Communication and International Division
Department of Statistics, Malaysia
Tel : +603-8885 7942
Fax : +603-8888 9248
E-mail : baharudin[at]dosm.gov.my

Contact person:
Baharudin Mohamad
Public Relation Officer
Strategic Communication and International Division
Department of Statistics Malaysia
Tel : +603-8090 4681
Fax : +603-8888 9248
Email : baharudin[at]dosm.gov.my
Copyright ©2026 Department of Statistics Malaysia Official Portal. All Rights Reserved.
An Error occurred while handling another error:
yii\web\HeadersAlreadySentException: Headers already sent in /var/www/html/dosm/frontend/controllers/SiteController.php on line 191. in /var/www/html/dosm/vendor/yiisoft/yii2/web/Response.php:368
Stack trace:
#0 /var/www/html/dosm/vendor/yiisoft/yii2/web/Response.php(341): yii\web\Response->sendHeaders()
#1 /var/www/html/dosm/vendor/yiisoft/yii2/web/ErrorHandler.php(136): yii\web\Response->send()
#2 /var/www/html/dosm/vendor/yiisoft/yii2/base/ErrorHandler.php(152): yii\web\ErrorHandler->renderException()
#3 [internal function]: yii\base\ErrorHandler->handleException()
#4 {main}
Previous exception:
yii\web\HeadersAlreadySentException: Headers already sent in /var/www/html/dosm/frontend/controllers/SiteController.php on line 191. in /var/www/html/dosm/vendor/yiisoft/yii2/web/Response.php:368
Stack trace:
#0 /var/www/html/dosm/vendor/yiisoft/yii2/web/Response.php(341): yii\web\Response->sendHeaders()
#1 /var/www/html/dosm/vendor/yiisoft/yii2/base/Application.php(390): yii\web\Response->send()
#2 /var/www/html/dosm/www/index.php(24): yii\base\Application->run()
#3 {main}